Caledonia Mining Corporation Plc ("Caledonia" or the "Company") (NYSE:CMCL, AIM: CMCL, VFEX: CMCL)) is pleased to announce the decision to proceed with the Bilboes Gold Project ("Bilboes" or the "Project") following completion and publication of the feasibility study (the "Feasibility Study")1.

Highlights

  • Single-phase development confirmed as the most economic development approach.



     
  • Mineral reserves:

    • Summary of proven and probable: 1.749 Moz of gold at 2.26 g/t. See Appendix for complete estimate, as extracted from the TRS.



       
  • Mineral resources (excluding mineral reserves):
    • Summary of measured and indicated: 532,000 oz of gold at 1.37 g/t. See Appendix for complete estimate, as extracted from the TRS.
    • Summary of inferred: 984,000 oz of gold at 1.62 g/t. See Appendix for complete estimate, as extracted from the TRS.



       
  • Processing: BIOX® technology selected for refractory ore.



     
  • Production profile:

    • Plant throughput of 240kt per month for the first 6 years of production, falling to 180kt per month for the remainder of the Project.
    • Metallurgical recovery ranging from 83.6% to 88.9%.
    • First full year (2029): ~200,000 oz.
    • Life of Mine: 1.55 Moz over 10.8 years.
    • All-in-sustaining cost ("AISC"): US$1,061/oz.