-+ 0.00%
-+ 0.00%
-+ 0.00%
Arbor Metals reports Phase 1 2026 drilling at Jarnet lithium project tops 260 ppm Li over 0.61 m
Share
Listen to the news
Arbor Metals reports Phase 1 2026 drilling at Jarnet lithium project tops 260 ppm Li over 0.61 m
  • Arbor Metals reported Phase 1 2026 diamond drilling results from its wholly owned Jarnet Lithium Project in Quebec.
  • Five holes totaling 1,433 meters returned 56 samples above 150 ppm lithium, averaging 174.8 ppm lithium.
  • Top lithium intercept was 260 ppm over 0.61 meters in hole JAR26-37; mineralization appeared as clustered samples.
  • Rare earth results averaged 166.2 ppm TREE across 122 intervals; best was 307.7 ppm TREE over 1 meter in JAR26-39.
  • Results pointed to a broad low-grade REE envelope; lithium showed no meaningful correlation with rare earth grades.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Arbor Metals Corp. published the original content used to generate this news brief via TheNewswire (Ref. ID: 202609030800TNWSWRCACNPR_____1k1vFqoYz) on September 03, 2026, and is solely responsible for the information contained therein.

Disclaimer:This article represents the opinion of the author only. It does not represent the opinion of Webull, nor should it be viewed as an indication that Webull either agrees with or confirms the truthfulness or accuracy of the information. It should not be considered as investment advice from Webull or anyone else, nor should it be used as the basis of any investment decision.
What's Trending