-+ 0.00%
-+ 0.00%
-+ 0.00%
T2 Metals reports 97.4% copper recovery in historical Sherridon flotation tests
Share
Listen to the news
T2 Metals reports 97.4% copper recovery in historical Sherridon flotation tests
  • T2 Metals released historical metallurgy from its Sherridon copper-zinc-gold-silver project in Manitoba, supporting processing route decisions.
  • A 2011 locked-cycle flotation test on a Lost Lake composite delivered 97.4% copper recovery to a 28.3% Cu concentrate.
  • The same test produced 90.1% zinc recovery to a 55.7% Zn concentrate from a 1.70% Cu, 5.08% Zn feed.
  • Results outperformed expected Flin Flon concentrator metrics at similar head grades, strengthening the case for toll milling evaluation.
  • Mineralogical characterization is underway across four deposits to guide confirmatory metallurgical testing for future economic studies.


Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. T2 Metals Corp. published the original content used to generate this news brief via Newsfile (Ref. ID: 202610070630NEWSFILECNPR____20261007_317815_1) on October 07, 2026, and is solely responsible for the information contained therein.

Disclaimer:This article represents the opinion of the author only. It does not represent the opinion of Webull, nor should it be viewed as an indication that Webull either agrees with or confirms the truthfulness or accuracy of the information. It should not be considered as investment advice from Webull or anyone else, nor should it be used as the basis of any investment decision.
What's Trending