-+ 0.00%
-+ 0.00%
-+ 0.00%
Baker Hughes Wins Power Generation Order, Cooling Order For U.S. Tech Company; Terms Not Disclosed; Contract Includes 34 Frame 5 Gas Turbines, 9 NovaLT 16 Turbines, BRUSH Power Generation Generators
Share
Listen to the news

The award includes 34 Frame 5 gas turbines, nine NovaLT™16 turbines, BRUSH™ Power Generation generators and associated gears to provide approximately 1.1 GW of reliable, scalable power generation to support high-performance computing infrastructure for AI model training, inference, and physical AI workloads. Baker Hughes will also supply Chart dry coolers as part of a closed-loop cooling system designed to support high-density AI workloads.

Disclaimer:This article represents the opinion of the author only. It does not represent the opinion of Webull, nor should it be viewed as an indication that Webull either agrees with or confirms the truthfulness or accuracy of the information. It should not be considered as investment advice from Webull or anyone else, nor should it be used as the basis of any investment decision.
What's Trending